• 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
99 % RH

#1
I have a 25 yr old slab (18,000 sq ft), on grade that has had VCT down for years with no issues, they are actually individual slabs that are apprx 12' x 16' ea ...The building sank, due to construction on a building next door, causing slab to sink apprx 2"...A company came in a "lifted" the slab by drilling 4" holes in the slab, forcing concrete down 30' into the ground, raising the slab back up, but also causing the slabs to move all over the place, meaning lots of floor leveling to do...By the way, this business is open 365 days a year & doesnt want to close...I have been contracted to rip & remove existing, reinstall new VCT...
did moisture test, calcium chloride at 3.22lbs, RH test 99%
Moisture mitigation not in the budget.... Any suggestions on how to get VCT installed without problems
Reply


Messages In This Thread
99 % RH - blowe88 - 03-07-2012, 02:53 PM
RE: 99 % RH - CCR - 03-09-2012, 06:23 AM
RE: 99 % RH - CC Solutions - 03-13-2012, 07:51 PM
RE: 99 % RH - eaadams - 04-25-2012, 12:13 PM

Digg   Delicious   Reddit   Facebook   Twitter   StumbleUpon  


Users browsing this thread:
1 Guest(s)