|
RH Testing Thick Slabs
|
|
11-20-2012, 03:43 PM
(This post was last modified: 11-20-2012 03:44 PM by CCR.)
Post: #25
|
|||
|
|||
|
RE: RH Testing Thick Slabs
The slab is 19 months old, and it will never, ever dry. I keep telling them this and they won't accept it. They're installing a static disipating, heat welded floor made by a well known manufacturer who is known to make premium, yet tempermental floor coverings.
They have a very good sf price for prep and application of the moisture system but don't want to spend the money. Right now, I blame the architect AND the GC for not knowing enough about concrete to have 1). specified a more open, porous finish and 2). not including a contingency spec and price for a moisture mitigation system. JK Nixon Concrete Restoration Services, LLC Pittsburgh, PA http://www.rhtester.com |
|||
|
« Next Oldest | Next Newest »
|
![]() |
|||||||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|



Help
Advanced Search




![[-] [-]](images/collapse.gif)







