RH Numbers Rising
|
|
09-09-2011, 08:11 AM
Post: #51
|
|||
|
|||
RE: RH Numbers Rising
(09-08-2011 06:08 PM)eaadams Wrote:(04-18-2011 04:46 PM)eaadams Wrote: I just had a GC in Los Angeles tell me they can't get the building acclimated because they can't get heat on until they get the occupancy permit and cant get occupancy permit until flooring is done .... If George used Wagner equipment he wouldn't have to worry about calibration and setting the reader to the probe to get the variation correct, he wouldn't have to let the probe equilibrate for about an hour, he wouldn't need to re-calibrate yearly and check calibration monthly, and he wouldn't have to worry about keeping all these calibration documents on file when a question comes up about accuracy! ![]() Slabs can dry just fine in 4 months if the entire team takes responsibility to achieve that goal! JD Grafton Concrete Answers for Flooring Problems JGrafton@ccsolves.com |
|||
|