![]() |
|
concrete slab drying time - Printable Version +- Concrete Moisture Measurement Forums (http://www.wagnermeters.com/concreteforum) +-- Forum: Concrete (/forumdisplay.php?fid=1) +--- Forum: Moisture Measurement in Concrete (/forumdisplay.php?fid=2) +--- Thread: concrete slab drying time (/showthread.php?tid=26) |
concrete slab drying time - jpeters - 07-07-2009 02:21 PM I've got a deck that I've got to measure, and I hear that they dry differently, or that ASTM classifies them differently, or something along those lines, because it's up off the ground. Is that true? RE: concrete slab drying time - admin - 07-09-2009 01:46 PM Is your concrete slab on a metal deck? How did you pour it? Basically, ASTM F2170 says that if the slab is drying only from the top, you should drill to 40% into it for your test. If it's drying from both sides (which means it's not on a metal deck or sitting on the ground with a vapor retarder below) than you only should drill down 20% of the thickness |